Base machine
- Formation envelope the supplier marks as inside the line: extrusion and spinning for spunbond or meltblown, or opening, blending and carding for spunlace, plus bonding and winding named on the drawing.
- Standard tooling listed for the usable width and gsm window on the RFQ; extra dies, spinnerets, card clothing or hydroentanglement jets stay outside this list until named.