Assumptions suppliers must quote
Formation route, usable width, gsm window, winding format, tooling list, three-phase supply, and whether water-treatment or process-air is included. Throughput must name feedstock and test conditions. Duty cycle for sanitation or product changeover is a separate statement from peak m/min. Work envelope and footprint affect installation cost even when the beam looks similar on a drawing.